Beta

Recovery and durability characteristics

What recovery certification proved (SOL-42) and the residual operational limits.

Raw

What SOL-42 proved

SOL-42 ran an isolated deterministic recovery certification service (not a full production DR exercise). Recorded scenarios include:

  • Process SIGKILL and restart with intact run/approval state
  • Worker lease recovery after kill
  • Duplicate delivery suppression (single side effect)
  • Database latency and outage fail-closed behavior
  • Object storage interruption with idempotent retry
  • Limiter and provider failover without double spend of budget
  • Cancellation race without duplicate cancel events
  • Backup hash restore with reference integrity

Evidence: artifacts/certification/sol42-evidence.json.

What operators must not assume

  • SOL-42 is not a measured production RPO/RTO for managed Supabase or object storage.
  • Multi-region failover is not certified.
  • Memory-only or local-disk stores that remain in deferred surfaces are not production canonical state.

Gateway limiter durability

Distributed limiter behavior (rate, concurrency, reservation refund) is covered by SOL-22 unit tests and SOL-44 multi-instance load certification. Production Redis configuration remains an operations concern outside this doc page.

Last verified 2026-07-27 · Owner docs-platform